NCCER (OQ) - INSTALLATION OF PLASTIC PIPE IN A DITCH TRAINING
Course describes the prerequisites and knowledge required for a pipeline worker to successfully and safely install plastic pipe in an excavated trench. It addresses the conditions and safety concerns of working in an open trench, pipe handling considerations, safety equipment, installation tools and equipment, inspection and installation procedures, and the abnormal operating conditions (AOCs) that may occur during installation.
Courses are for training only and do not include tests or certificates.
Course Information
- Class Type: A
- Course Length: 0.25
- Language: English
- Delivery Method: eLearning
- Member Pricing: $25
- Non-Member Pricing: $30
- Passing Score: 100
- Expiration Days: 1095
- Exam Type: WE